Headquartered in Boston, MA, Beth Israel constructed their first new building in 20 years. This ten-story, 345,000 SF facility is intended to meet the needs of their patients in a rapidly changing health care environment. The building features single-bed, family-friendly rooms, along with a wide range of surgical, diagnostic, and procedural suites. It also includes conference space, rooftop gardens, and a medical helicopter landing pad.
MMS was asked to provide prefabricated electrical rooms for each floor of the new inpatient building.
- Skid included: panels, circuit breakers, wiring, conduit, and transformers for both normal and emergency power rooms for each floor.
- This effort helped accelerate the installation of new electric rooms and emergency electric rooms on each floor.
- These units were installed in March 2021 with full occupancy in Fall 2022.
- Vertical: Healthcare